Chlorine measuring probe maintenance procedure

Categories: Pool
Wishlist Share

About Course

This tutorial illustrates the correct procedure for maintaining the chlorine measuring probe, describing all the necessary operations to perform the intervention safely and effectively. The stages of disassembly, cleaning, component verification, reassembly, and system restart will be shown, up to the final stabilization and calibration of the probe, with the aim of ensuring accurate measurements and the correct functioning of the system.

downloadDownload the version PDF Of this course.

What Will You Learn?

  • Prepare for the intervention safely by using protective equipment.
  • Correctly disassemble the measuring probe, disconnecting the components without damaging them.
  • Clean and inspect the sensors, recognizing when a component can be salvaged or needs to be replaced.
  • Reassemble the probe, checking the correct positioning of seals, electrodes, and electrical connections.
  • Restore system operation by reactivating the water flow and properly starting the system.
  • Stabilize and calibrate the probe to ensure reliable measurements and optimal system performance.

Course Content

Chlorine probe maintenance

  • Guided procedure for chlorine probe maintenance
    00:00